Construction Scheduler Engineer, H-1B salary
What 4 H-1B filings report for “Construction Scheduler Engineer” (LCA, FY2017–2026): pay percentiles, the states paying most, and who files.
What is the H-1B salary for a Construction Scheduler Engineer?
$63k median H-1B base salary for a Construction Scheduler Engineer, typically $58k to $87k, across 4 H-1B LCA filings with the U.S. Department of Labor (FY2019 to FY2024).
Browse open jobs at H-1B sponsorsRefreshed daily · apply straight with the employer
No exact matches for “Construction Scheduler Engineer”, showing the closest job titles.
Entry-ish (p10)
$58k
10th percentile
Middle 50% (p25–p75)
$60k–$73k
interquartile range
Median base salary
$62,721
4 filings
Top (p90)
$87k
90th percentile
p10 $58k
median $63k
p90 $87k
Median pay & filings over time · H-1B · FY2017–2026*
Top-paying states
Median for this title · ≥20 filings
Not enough state-level data.
Top employers for this title
Most H-1B filings · with each employer’s median for the role
- 1CMES2 filings$81k
- 2O'Brien Construction Company2 filings$59k
Figures are for the exact title “Construction Scheduler Engineer”; for a rare title we widen to the closest related titles (flagged above when that happens). To benchmark a specific offer by employer and state, use Salary Check.